Southwest Christian High School

Chaska, MN

Project Size

63,000+ SF New Const.

Project Scope

Performing Arts Center

Architect of Record

Daniel Cook, BGW Founder Emeritus

Project Completion Date

Jan 2019

Since the completion of the first phase of construction in 2012, Southwest Christian High School has grown from 185 to 343 students, approaching maximum enrollment for the existing facility. Phase 2 of construction is a west wing campus expansion that includes a 750 seat performing arts auditorium with oversized performance stage and orchestra pit, black box theater, back stage scene shop and dressing rooms. The new facility also features an outdoor amphitheater and ample music education space.

 

The lower level features classrooms for robotics and engineering, science labs, computer/CAD Lab, and a pro-tech area. Weekly chapels, as well as concerts, theatrical productions and school assemblies, will have a new home in this space. Master plans for the school also include a future second gymnasium for the east end of the school campus, where a soccer field currently lies. There is also a track surface around the soccer field on the north end of the campus to be built in future plans.

 

Click here to view the grand opening of the Southwest Christian High School building expansion

© 2018 Building God's Way | 800-552-7137