[vc_gallery type="flexslider_slide" interval="5" images="41798,41796,41797,41799,41800" img_size="full"]

Indian Creek School

Crownsville, MD


Project Scope

98,000 SF education building for Gardes 7-12

BGW Builder

EDIS Construction

Project Completion Date

September 2006

In 2004, Indian Creek School decided to expand and bring its philosophy and curriculum for elementary education to the junior high and high school level. A capital campaign called “Taking Flight” began and the school partnered with BGW to design a 96,000 square foot facility on a 114 acre campus just a few miles from the original Elementary school location. 


The facility features a stand alone auditorium that seats 450 students, with a sloped floor, theater lighting and a full-size stage for quality productions by the performing arts classes. The cafeteria and corresponding outdoor patio is served by a fully functioning commercial kitchen. The 32 classrooms, two science rooms, a library and an administrative wing (15 offices) complete the facility – leaving plenty of room for future growth. The building also includes a gymnasium with three full-size basketball courts that allow for plenty of daily practice room to all of the school’s teams. The selection of local brick allowed the design team to develop a traditional look, but the addition of metal and glass components brought contemporary appeal to the exterior. The two-story facility is tempered in size by the three towers on its front façade, while an engaging window design creates interest.

© 2018 Building God's Way | 800-552-7137