Grand Parkway Baptist Church

12,000 SF Children’s Ministry Addition



This was the second phase of construction that BGW completed for Grand Parkway Baptist. The first phase, completed in 2019, featured a new 22,105 SF worship center. This two-story, 12,000 SF addition, called “The Bridge” added 16 spacious children’s classrooms and large gathering / group worship spaces on each floor. The first floor is dedicated to K-3rd grade and the second floor houses the 4th – 6th grade kids. The building was connected seamlessly with the first phase worship center and includes a secure, digitized check-in system where parents receive a three-digit security sticker matching their child’s tag.